Plenty of people build their own fence, and a straightforward run on flat ground is a genuinely reasonable weekend project. What sinks most DIY fence jobs is not the labor, it is the ordering: showing up short on rails halfway through Saturday, or discovering the gate hardware you bought is not rated for the gate you built.
Start with an accurate measurement of the actual line, not the plat. Walk it with a tape or a measuring wheel, mark your corners and every gate opening, and write the segments down separately. Corners and gates are where post counts come from, and guessing at them is the single most common ordering mistake.
Then settle height before anything else, because height determines post length and rail count. A six-foot fence generally wants three rails; four-foot runs are usually fine with two. Post length should account for the depth you are burying, not just the height above grade.
Count posts carefully: one at each end, one at every corner, one on each side of every gate opening, and line posts at even spacing in between. Gate posts are the ones people undercount, and they are also the ones that should be beefier than the line posts because they carry a swinging load.
Do not forget the consumables. Concrete by the bag, fasteners rated for treated lumber, post caps, hinges, and latches all get skipped on the first list and all stop the job cold when you run out.
Or skip the arithmetic. Bring us your footage, your height, and your gate count, and we will work up a full material take-off for free and pull it from our own stock. Even if you are doing every bit of the labor yourself, there is no reason to do the counting alone.
